Process

Twelve stages. No surprises.

Open any stage to see who owns it, what you receive and the gate it must pass before the next one begins.

01

Brief

Develop
Owner Merchandiser
You receive Written summary of product, quantities, target price and dates
Quality gate Brief confirmed in writing by both sides
02

Tech pack review

Develop
Owner Technical team
You receive Marked-up tech pack with questions and suggestions
Quality gate All open questions answered
03

Fabric and trim sourcing

Develop
Owner Sourcing team
You receive Fabric and trim proposals with swatches, prices and lead times
Quality gate Fabric and trims approved
04

Lab dips and strike-offs

Develop
Owner Sourcing team
You receive Colour and print submissions under agreed light sources
Quality gate Colour approval received
05

Proto sample

Sample
Owner Sampling room
You receive First sample in approved or substitute fabric
Quality gate Design comments returned
06

Fit sample

Sample
Owner Pattern master
You receive Base-size sample with full measurement report
Quality gate Fit approved
07

Size set

Sample
Owner Pattern master
You receive One sample per size with graded measurements
Quality gate Grading approved
08

PP sample and approval

Sample
Owner Merchandiser
You receive Pre-production sample in bulk fabric and trims
Quality gate Signed PP approval
09

Bulk cutting

Produce
Owner Cutting room
You receive Cut report by size and colour, shade-banded
Quality gate Cut quantity reconciled to order
10

Sewing and inline QC

Produce
Owner Production and QA
You receive Daily output and inline inspection reports
Quality gate Inline defect rate within limit
11

Finishing and final inspection

Produce
Owner Quality assurance
You receive Final AQL report with photographs
Quality gate Inspection passed to agreed AQL
12

Packing, documents and shipment

Ship
Owner Logistics
You receive Packing list, invoice, certificates and shipping documents
Quality gate Goods handed over on the agreed Incoterm